I think that too. Perhaps the display is working off the internal battery but the internal connections of the timer have had it.
I will stick an FCU in its place as a temporary measure to get some hot water and get a new timer tomorrow. Thanks for your input.
Can you guys offer some help please. Im sure the timer is the issue but the display is showing thats its all working.
Immersion heater timer is a Timeguard FST 11A
Power to the timer
No power to immersion heater with timer switched on
Fuse in the timer is is showing continuity
240 volts power...
You may choose to vent the void but I haven't yet - its something I am considering doing with 100mm vent cowl - I will most likely add 2 or 3 however if you use the multifoil insulation fixed directly to the roof bars then I'm not sure if you need them but you will have to look into it further...
The brittle plastic tiles you have look like a thing called a Prismatic diffuser - usually used with 600mm x 600mm "office" lights.
The things they are resting on is called suspended ceiling grid. the grid comes in 2 widths (24mm and 15mm wide)
If I was you I would take it all down and...
Have a look at this data sheet from BG:
http://www.gyproc.ae/pdf/Gyproc_Plasterboard_Adhesive.pdf
It gives installation details of trowling on the adhesive and also the mixing. Granted it doesn't state what thickness the dabs will be though.
Also google the following and it will bring up the...
My conservatory Floor space is approx 4m x 3.3m
Cost wise (approx and off the top of my head)
The Timber spaces are at 450mm centres
Timbers - £150
Bolts and brackets - £30
100mm Insulation (doubled up) - 24m2 @ £2m2 (2 rolls)
Plasterboards - £30 (1800x900x12.5mm)
Electrics - £10
Plasterer -...
This is what I done to mine
200mm of loft roll in the void. Been up over a year now and its brilliant. Cosy in winter and cool in the summer,
Untitled by adam1984 posted 13 Jun 2014 at 11:45 AM
Untitled by adam1984 posted 13 Jun 2014 at 11:45 AM
Untitled by adam1984 posted 13 Jun 2014 at 11:47 AM