- Joined
- 7 Oct 2015
- Messages
- 1
- Reaction score
- 0
- Country
Id be grateful for any advice regarding some work my father had done today. A guy pitched up and said he was working in the area and noticed a problem with his ridge tiles. He inspected them and said they needed refixing and said he could do it for 950 quid cash. My father called me and i told him it sounded too high. He got them to stop but theyd already been up there for 20 minutes and fitted a clip to one of the end ridge tiles. They are coming back tomorrow to see me about the job. Im going to say no and expect to be charged something for the work that they did in those 20 minutes. Im trying to get an idea as to what would be fair so my dad doesnt get ripped off. Thanks in advance for any advice