You need to re-pipe the open vent and cold feed pipe in relation to the new pumps location.
It should be boiler, open vent, cold feed, pump on the flow. Need to fit an auto-bypass if using x2 2 port valves as well.
Would also tee in the cylinder return closer to the boiler and not...