  1. P

    Polyphosphate scale inhibitor position

    either the Sentinel one or the BWT one?
  2. P

    Polyphosphate scale inhibitor position

    Hi looking at the installation instructions for one of these it states that the inhibitor should be placed before the Boiler. Is there any reason it cant be installed (or has anyone tried this) just after the main stop cock therefore protecting all the plumbing from lime-scale? Thanks :-)
  3. P

    do i need to nail the tile batons at every rafter?

    Do I need to nail the tile batons at every rafter? also tiles, do I need to nail every tile? (concrete double pan tiles on 18deg pitch) at then roof ends tiles need to be cut in half in order to maintain joint staggering? Thanks :?
  4. P

    do i need noggins?

    thanks theoldun This forum is extremely helpful and that's only due to people like you, noseall and others that help the less knowledgeable like myself. :D :D
  5. P

    do i need noggins?

    theoldun i have 2 hips as the roof goes down the side of my house, juts out a little, then around the back and over an old flat roof extension. hence the two hips. i have a gable at the front. the joining of the celling joists is over the new extension (2.7m span) and over the old...
  6. P

    do i need noggins?

    also another quick question. to join two celling joists together over a wall plate at the middle, would it be best to over lap them by a certain amount and bolt them together with another piece as a packer so they are either side of the rafters at the eaves? thanks again
  7. P

    do i need noggins?

    Thanks guys for your wisdom. :D do i only need to attach restraint straps to rafters and not to ceiling joists at the gable?
  8. P

    do i need noggins?

    I have a pitch roof of 20deg and a span of 2.7m. I have used C24 150x50 for rafters and celling joists. (The roof runs down the existing house wall then a small ridge meets two hips.) Do i need to put noggins between rafters and between joists? if so do they need to be 150x50? i obviously...
  9. P

    hip angle

    thanks any idea if it ok to use a 25x200 ridge board as a hip and butt rafters to it. it works out to be 3.9m long? if so i assume i would have to brace it or do i need to use 50x200 graded?
  10. P

    hip angle

    Thanks for your help Noseall i guess that's why you're called noseall :D
  11. P

    name of the board used to cap the cavity under the tiles

    Thanks for your help guys. any idea if it ok to use a 25x200 ridge board as a hip and butt rafters to it. it works out to be 3.9m long? if so i assume i would have to brace it or do i need to use 50x200 graded? :D
  12. P

    hip angle

    i am building a roof with two hips. i have got to the 1st hip and i have a choice but i need help. if i put the hipboard from the last rafter (at the ridge) to the corner of the wall it will make an angle of 44deg and therefore the jackrafters on the other side of the hipboard wont line up...
  13. P

    name of the board used to cap the cavity under the tiles

    thanks catlad for the name. any idea if it ok to use a 25x200 ridge board as a hip and butt rafters to it. it works out to be 3.9m long? if so i assume i would have to brace it or do i need to use 50x200 graded? Thanks
  14. P

    name of the board used to cap the cavity under the tiles

    the board indicated in the picture :D
  15. Untitled

    Untitled

  16. P

    name of the board used to cap the cavity under the tiles

    what is the name of the board that bridges the cavity and which the roof tiles sit on on a gable end called? also where does the (under tile) membrane finish at the gable end? is it ok to use a 25x200 ridge board for my hips and butt the rafters to it? thanks
  17. P

    ridge board and support

    ah, so the ridge board doesn't support the ridge tile so therefore doesn't need to sit proud?
  18. P

    ridge board and support

    Hi I building a pitched roof along side my house which extends beyond the back wall and then (with two hips) covers an existing extension. This means there will be a small ridge (1m long) to allow the hips to be at 45deg. I have a bearer plate bolted to the wall. See pictures (...