get ready to drain down full sysem, unless the rad is on first floor.
you might be lucky and cut more of the plastic sleeving (if that is 10mm microbore with a sheath) back and push the copper pipe in more.
the part you need would be a 90 degree 10mm bend MF or street elbow as others call...