  1. E

    Cast iron radiator bushes

    Thanks all. Don't worry about the ball-o-fix valves, they were just temporary for pressure testing the pipework.
  2. E

    Cast iron radiator bushes

    I'm trying to revive some old cast iron radiators and am having trouble removing some of the old fittings. Previously the rads were piped with the valves at diagonals, one bottom left, one top right, plug and bleed valve on top left, and a blank plug on the bottom right. I now want to remove...
  3. Untitled

    Untitled

  4. E

    Help identifying make/model of basin tap

    Thanks guys, but none of the parts linked to look to be quite the same. If I have to fit new heads to both taps then I will, but I'd prefer to stick with what's currently fitted. I might be able to remove the broken section of stud from the old tap, but I still have no idea where to purchase a...
  5. E

    Help identifying make/model of basin tap

    Evening all. Is anybody able to identify the brand and model of tap in the attached pictures? I believe it to be Ideal Standard, as that's the brand of the basin and the rest of the bathroom fittings, but it doesn't seem to be part of their current range. Unfortunately I managed to shear the...
  6. Untitled

    Untitled

  7. Untitled

    Untitled

  8. Untitled

    Untitled

  9. Untitled

    Untitled

  10. Broken tap

    Broken tap

  11. E

    Electric boiler - G3 required?

    I would tend to agree, but I'm not sure how practical that would be. Does such a thing as a 15kW wet storage boiler even exist? It would surely have to be huge to retain enough heat to sustain system output during the day. Largely irrelevant anyway, the supply is split from the landlord...
  12. E

    Electric boiler - G3 required?

    Thanks Richard, I hadn't come across ACV in my searching, though they appear to be more expensive than the other two brands I mentioned previously. I can understand why that'd be the case when compared to the Elterm Mars, which isn't electronically power adjustable or triac controlled, but it...
  13. E

    Dos this sound correct? New plug installation.

    Buy yourself one of there. I bet the system won't be drawing anywhere near as much power as you think, even with five high end graphics cards.
  14. E

    600x600 office suspended ceiling lights

    They'll be no more difficult for your electrician to connect than any other light, as far as wiring is concerned.
  15. E

    Electric boiler - G3 required?

    Elnur CM15 or Elterm Mars series, as these seem to be the only two in the 12-15kW range that can be run on three-phase. If you know of any others then I'd be glad to hear it. Absolutely cannot be single phase, as the supply to the entire building is only 63A/phase.
  16. E

    Electric boiler - G3 required?

    So what's the deal with an electric flow boiler with internal expansion vessel <15l, i.e. an electric system boiler with no DHW storage?
  17. E

    Electric boiler - G3 required?

    Care to elaborate on that, Dan?
  18. E

    Electric boiler - G3 required?

    Thanks Tony, being an electrician I was unsure as to whether it was the system volume as a whole, or the storage capacity inside the boiler itself. Presumably similar rules apply regarding PRV pipework?
  19. E

    Electric boiler - G3 required?

    With regard to electric system boilers, can anyone tell me whether or not a G3 cert is required to install such a system? As far as I can tell, it carries a similar inherent risk to an unvented cylinder. Oh, and before anyone mentions it, yes, I realise electric boilers are the devil's spawn...
  20. E

    Earth block

    http://www.tlc-direct.co.uk/Products/ASJ701.html along with suitably sized terminal strip would be a more standard solution. You'd prefer not to see it on a new installation, but as you have to work with what you've got... Oh, and you'd want to clip the cables where the exit the box to...