Hi,

I am moving an underground drainage run that supports only waste from my building.

There is a part where I am going to have to go round the corner of my house with a 90, either side of this 90 will be about 4 metres. Instead of putting a chamber for access could I T off vertically for rodding points?

Lastly is there a correct way to block up a run that won't be used anymore or would concrete be fine at both ends?

Thanks in advance
 
Sponsored Links
Call your local Building Control and ask them to send an inspector round - this is notifiable work and as you're not qualified to sign it off yourself, you'll need to do it the way the inspector wants it doing so he'll sign it off for you
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top