If Building control checking something incorrectly who is to blame and take responsibility ? BC or builder ?
E.g
Ground Floor insulation should be 200mm thick when using loft roll but only 100mm has been laid down.
E.g
Ground Floor insulation should be 200mm thick when using loft roll but only 100mm has been laid down.