Hi all,
I had my concrete poured today (yes in the rain). Its pretty dark, wet and snowy out there but i may have noticed that for a small part of the 600mm trench we are off centre.
Its only a 1200mm section but still if this is the case can i build the 100mm external skin right on the edge?
The main bit is 140mm blockwork for timber frame.
Hope this isn't the case but thought I would see what the fixes would be if I need it?
Thanks