i am building a rather large patio at the back of the house,,, i am happy with the requirements for the ground which is ready..
it is going to be square with a house wall on 2 sides of the square, so am i right in thinking start from that corner?
- whats the fall away from house have to be (i will be using a plum line to tap the slabs into postions, say if 5m long, how high off ground should first slab be as opposed to other side.
- whats the best mix, i dont want to use just sand, someone said drymix (could you plz tell me the mix and type of sand and how much water to add)
thx
it is going to be square with a house wall on 2 sides of the square, so am i right in thinking start from that corner?
- whats the fall away from house have to be (i will be using a plum line to tap the slabs into postions, say if 5m long, how high off ground should first slab be as opposed to other side.
- whats the best mix, i dont want to use just sand, someone said drymix (could you plz tell me the mix and type of sand and how much water to add)
thx