Some advice please form you professionals
Iv drawn up plans for a variation into conditions for a car wash
Conditon 4- change of opening hours
Condition 5= screening, barriers and drainage
Planners want to have a screening to prevent water spray to walking pedestrians.
My idea would be to have 21/2 inch metal poles embedded in concrete and have 18mm perspex sheets fitted in between the poles. Would that be OK?
Also please advice on drainage, Please see decision letter and the drawings which will give you a idea.
http://imageshack.com/a/img836/7985/cmp9.jpg
http://imageshack.com/a/img845/8373/svcf.jpg
Any information would be gladly apreciated[/img]
Iv drawn up plans for a variation into conditions for a car wash
Conditon 4- change of opening hours
Condition 5= screening, barriers and drainage
Planners want to have a screening to prevent water spray to walking pedestrians.
My idea would be to have 21/2 inch metal poles embedded in concrete and have 18mm perspex sheets fitted in between the poles. Would that be OK?
Also please advice on drainage, Please see decision letter and the drawings which will give you a idea.
http://imageshack.com/a/img836/7985/cmp9.jpg
http://imageshack.com/a/img845/8373/svcf.jpg
Any information would be gladly apreciated[/img]