Chaps,
Halfway through a concrete footing for a retaining wall and its started chucking it down.
Need a couple more mixer loads to complete it, and was then going to position my first row of blocks and stick in the rebar.
Can I leave the 3/4 done foundation until it stops raining or should I be doing something now?
Thanks,
James
Halfway through a concrete footing for a retaining wall and its started chucking it down.
Need a couple more mixer loads to complete it, and was then going to position my first row of blocks and stick in the rebar.
Can I leave the 3/4 done foundation until it stops raining or should I be doing something now?
Thanks,
James