Hey all
About to start building a lean to carport over my drive but want to put down 2 courses of bricks to put the upright panels on (so the timber isn't sitting on the drive).
However.. the slab thats on my drive runs away quite a bit. I've got around 4" to make up over a 6m run.
Whats the best way to get the brick level?
Thanks in advance