In my loft I have studded out the wall what divides the two houses. I have insulated with lagging and am going to put a 6 mm vapour barrier then plaster board.
What I need to know is at the top of the wall what meets the roof there is a draft there coming through the felt.
Shall I leave this to let behind the new wall breathe or seal it as its a internal dividing wall ?
What I need to know is at the top of the wall what meets the roof there is a draft there coming through the felt.
Shall I leave this to let behind the new wall breathe or seal it as its a internal dividing wall ?