I seriously favour wired every time.
A five-bed house I wired about 10 years ago. All multicores under floors, through loft, sunk in walls, SABs front & back, panics front door & main bed, back window openings, & RKP by entrance - really top job with Menvier panel hidden away.
Problem after all this time with RKP.
What does he do?
Puts a wireless system in & cuts all the multicores.
I call that vandalism.
A five-bed house I wired about 10 years ago. All multicores under floors, through loft, sunk in walls, SABs front & back, panics front door & main bed, back window openings, & RKP by entrance - really top job with Menvier panel hidden away.
Problem after all this time with RKP.
What does he do?
Puts a wireless system in & cuts all the multicores.
I call that vandalism.