We have installed a gravity fed shower under the stairs, it is all boarded and plastered out.
2 questions
1. What is the best technique for tiling it? Tiles or PVC cladding
2. The waste outletneeds to come out the front right hand side to an exit on an exterior wall, how much drop will it need and what is the smallest diameter waste pipe I could use?
2 questions
1. What is the best technique for tiling it? Tiles or PVC cladding
2. The waste outletneeds to come out the front right hand side to an exit on an exterior wall, how much drop will it need and what is the smallest diameter waste pipe I could use?