I'm about to start laying the slabs in a 5x5mtr area with a drain in the dead centre.
Is there a set method for doing this? I've heard of the envelope method and i'm assuming that it's a matter of quartering the area and laying the slabs from the perimeter edge tapering towards the drain with drop off of a couple of inches.
Have i got this right?
Thanks, Calum