hi there,
First time here as I am stuck for ideas to solve my problem. Having ordered and recieved my 10 x 6 concrete shed (in 1m x 2ft panels) from a company called Leofric. I have laid the base and now need to put the thing together...there lies the problem. I am doing the job on my own, freinds have distanced themselves whilst this is being done. I need to find out if there is a a mechanised way of lifting the panels into position. Can I hire a winch or something that will enable me to lift these panels???
Thanks
First time here as I am stuck for ideas to solve my problem. Having ordered and recieved my 10 x 6 concrete shed (in 1m x 2ft panels) from a company called Leofric. I have laid the base and now need to put the thing together...there lies the problem. I am doing the job on my own, freinds have distanced themselves whilst this is being done. I need to find out if there is a a mechanised way of lifting the panels into position. Can I hire a winch or something that will enable me to lift these panels???