hi, got a job of changing an attatched garage into a living room, the only problem ive got is the sloping floor, 2 inch drop from back to front. the front is also 6 inch lower than the house floor level, 4 inch at the back, the owner wants it done cheap as possible, can i screed it bearing in mind ive only got 4 inch at the back and 2 inch will be insulation?, or do i take the floor up and relay level knowing that its got re-bar in it and its going to be the most expensive, or can i put joists down cutting them to get the floor level then boarding them out, i think the joists option is the cheapest but the rest of the house is concrete floor, will there be an issue with building control etc?, any info will be grateful