When its stopped raining and we have a dry day am going to be laying some slabs (not big heavy ones) for a path.
could someone give me some pointers on the best way to do (otherwise ill advertise on gumtree lol). Underneath the is some sub base stone (not small stuff though), so am thinking of leveling it of with ballast first.
Would it be better using a dry mix or wet mix?