I've got 22mm copper pipework on my system - all surface mounted and it obviously looks less than great! A few questions to you clever people:
1) Can I change to 15mm, and if so does it have to be the whole system
2) Is 15mm plastic piping just as good
3) Is there a good way of masking the existing pipes at skirting board level (other than a simple box) - eg a curved preformed section?
Many thanks for any help offered on these points! :confused:
 
Sponsored Links
Sponsored Links
Its impossible to answer yor question from what you have said so far.

Simply 22 mm is needed to feed more than three rads. Each rad can be fed with 15 mm. Last three can be fed with 15 mm.

Its very unusual to have everything in 22 mm so I suspect you may need professional advice.

Above does not apply to single pipe systems or necessarily if they are high water content rads like some cast iron types or any other peculiarities.

Tony
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top