Hi,
I have removed loads of old / hollow plaster off the bathroom wall and plan to tile this wall.
It's had about a week already, but some of the plaster is up to an inch thick to make wall more level than it was (old stone wall).
How long should i wait before tiling?
thanks in advance.
I have removed loads of old / hollow plaster off the bathroom wall and plan to tile this wall.
It's had about a week already, but some of the plaster is up to an inch thick to make wall more level than it was (old stone wall).
How long should i wait before tiling?
thanks in advance.