WDIFY

Joined: 09 Jul 2007 Posts: 1 Location: Hampshire, United Kingdom Thanked: 0 times
|
Posted: Mon Jul 09, 2007 9:33 pm Post Subject: Replacing Cover Flashings |
 |
|
We have to replace a cover flashing on the join between a parapet and flat roof. The flashing on the top edge is fitted below a single soldier course of bricks most of which have become loose and will have to be re-cemented into place.
Question; Do we fit the flashing and then cement on the top course of bricks or bearing in mind the expansion problems do we re-cement the top row and then chase in the flashing?
Cheers Paul |
|
noseall

Joined: 02 Feb 2006 Posts: 11053 Location: Staffordshire, United Kingdom Thanked: 71 times
|
Posted: Tue Jul 10, 2007 4:46 pm Post Subject: |
 |
|
take off the header course of bricks, re-do flashing then bed the bricks back onto the flashing. |
|