Depends on the concrete was it volumetric or mixer lorry or mixed up on site with a small mixer?
The first two will have far too much water in them and take longer to set and harden. Most of slabs I've done by hand 3 ton 9 " rebar for my garage was about 3-4 days.
I had 42mtrs of 16mm swa run down to my garage. Had a 100 amp. Cu in there with a 16amp socket for my inverter tig welder. Ran the wifi down the armored with a tplink main plug worked a treat.
Get a new cartridge then pull out old one with pump grips I had same valve it's very prone to limescale blockage on the screens. I manged to get a cartridge out of crosswater free of charge...
Each two port gives independent control. You you can have radiators on there own. Or ufh on it's own or both together. The only caveat is during hot water production you get neither.
Well to give you an idea. I did a extension underfloor job few months ago.
Single zone 120 mtr roll of polypipe ultra flexible pipe, clipped down. 25/60 pump. On a single zone mixing valve. With a 2 port valve wired up to a heatmiser prt v4 programmable roomstat.
Roll of edge surround pinned...
That setup would definately invalidate any household insurance you probably don't even have.
Wet boilers for logburners are a very specific hetas ticket.
Normally 300mm to combustable from top of stove.
Originally we had oak beams to go around the fireplace opening, however couldn't get it to work as we had a logstore ivar 5 and I wanted the hetas guy to sign it off.
He fitted the liner and the actual fire, I did the opening up and Cladding of...
The underfloor pumps are 50% smaller than they should be.
They should be 25/60s or 7/8. At that time would have been grey grundfos pumps.
The pump of choice price wise is wilo para atm.
The flow rates on circuits probably a bit high aim for 1-1.5ltr sec on 100mtr circuits. Too high heat won't...