Drilling 42mm holes through joist for shower tray drain

Joined
5 Aug 2009
Messages
6
Reaction score
0
Location
Cambridgeshire
Country
United Kingdom
Hi, I am just about to replace the shower tray in my en-suite and will be relacing the old tray with legs for a stone cast one that sit flush to the floor boarding (chipboard). The existing drain runs above the floor and down through the floor next to the wall from where it runs parallel to the joists into the soil stack. I will now need to take the drain (and the sink drain as this also ran under the shower tray) under the floor and this will mean drilling 2 off 42mm hole through the joists (near to the wall end of the joist)

Is this a bad idea from the point of view of weakening the joist (~180mm wide)??

Plan B would be to drop both drains straight down the utilities room wall below, T together, and plumb through the outside wall into the outside grid, alongside the utility sink/washing machine drain. Is this a better option??
 
Sponsored Links
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top