Hi guys after confirmation from council and asking on here a while back that i don't need planning, I'm ready to close an unused side door ~1m high and install a window in the remaining gap.
Ill tie the block work into the existing with wall starters. The wall is double skinned brickwork. After DPC, Should I..
1. Use double skin thermal(or concrete?) blocks and render the exterior, plaster/ render the interior. OR
2. Use single skin thermal blocks, render the exterior then batten the inside skin and use pir insulation(I have 100mm spare), seal all edges with foil tape for a dpm and plasterboard.
Did i miss anything? any other recommendations? Thanks guys.
Ill tie the block work into the existing with wall starters. The wall is double skinned brickwork. After DPC, Should I..
1. Use double skin thermal(or concrete?) blocks and render the exterior, plaster/ render the interior. OR
2. Use single skin thermal blocks, render the exterior then batten the inside skin and use pir insulation(I have 100mm spare), seal all edges with foil tape for a dpm and plasterboard.
Did i miss anything? any other recommendations? Thanks guys.