We have found a house to buy (we are first time buyers) and have been advised that it is a trusteel construction. The mortgage company of course have instructed us to get a MICS or FICS construction report carried out at a cost of £1000 including VAT before they will even consider lending on this.
As you can imagine, my husband and I are extremely nervous and have read mixed comments with regards to this type of structure. Can you please advise whether or not we should proceed or whether we should walk away now and go back to the drawing board.
Thank you so much as we are in a catch 22 situation.
As you can imagine, my husband and I are extremely nervous and have read mixed comments with regards to this type of structure. Can you please advise whether or not we should proceed or whether we should walk away now and go back to the drawing board.
Thank you so much as we are in a catch 22 situation.