Hi,
Those following my threads will probably have seen a few moans about my plumber. I took these photos today as not sure this is correct. This is basically first fix pipe runs in a timber frame house.
This first one is for mains feed to roof he added an isolation valve which i have to somehow surface mount he said is fine will be hidden behind cabinets in utility. Not sure how I'm supposed to plasterboard it of maintain a VCL on the frame.
This one is for radiator feed on first floor. I showed him the rads and where i was putting them but he doesn't want to take responsibility of drilling through in the wrong place so has put them on a loop and told me to put them in when I've hung the rad? Obviously i can't finish the ceiling below before the wall above which seemed odd to me plus ill have to drain down to feed the loop through.
Any thoughts on this?
Those following my threads will probably have seen a few moans about my plumber. I took these photos today as not sure this is correct. This is basically first fix pipe runs in a timber frame house.
This first one is for mains feed to roof he added an isolation valve which i have to somehow surface mount he said is fine will be hidden behind cabinets in utility. Not sure how I'm supposed to plasterboard it of maintain a VCL on the frame.
This one is for radiator feed on first floor. I showed him the rads and where i was putting them but he doesn't want to take responsibility of drilling through in the wrong place so has put them on a loop and told me to put them in when I've hung the rad? Obviously i can't finish the ceiling below before the wall above which seemed odd to me plus ill have to drain down to feed the loop through.
Any thoughts on this?