Flashing pointing keeps cracking

Joined
6 Sep 2018
Messages
74
Reaction score
1
Country
United Kingdom
Hi,

Last Spring I repointed some lead flashing, some parts had cracked other bits had fallen out. Looking at it yesterday I see that it already has fine cracks in it and some tiny bits are missing.

I see two possible reasons for this, it doesn't look as though the lead is very tight around the joint, it seems to have mostly cracked where the mortar meets the lead. Perhaps this is normal.

Also it is above a uPVC window which has no external lintel so there is slight movement in the brickwork. While repointing, some of bricks in the course above were ever so slightly loose so I took great care to fill every part of the joint with mortar.

I don't think raking it all out and starting again will solve anything, unless I re-did all the lead work, which maybe beyond my ability.

So what about using something like Ever Build lead mate?

https://www.everbuild.co.uk/product/lead-mate-sealant/

But instead of raking out just put a bead over the existing mortar all the way along. It says it's permanently flexible.

Good idea or not?

Or get a proper roofer in?

Thanks,

Bob
 
Sponsored Links
Leadmate is the awnser.

Rake out the cement and point the joint with leadmate.

Make sure the lead is securely wedged before pointing.
 
Doing it properly is the answer.

Rake out the joint to 25mm, dampen the joint, fill with a mortar that's not too strong, (5:1) and compress and tool the face nicely.

Assuming the lead is properly angled into the joint (the bend pre-formed at 90° and not bent into the joint whilst placed on the wall), is a good 15-20mm into the joint, and securely wedged.

Cracking mortar is caused by it being too strong, drying too quick, and being too thin.
 
Sponsored Links
Has anyone got any images of leadmate that shows a nice crisp, straight and even joint rather than a wavy up and down in and out series of blobs?
 
Where we do use it in some circumstances. If your brick is soft forget it and use nhl 3.5 mix
Full fill joints
 
Doing it properly is the answer.

Rake out the joint to 25mm, dampen the joint, fill with a mortar that's not too strong, (5:1) and compress and tool the face nicely.

Assuming the lead is properly angled into the joint (the bend pre-formed at 90° and not bent into the joint whilst placed on the wall), is a good 15-20mm into the joint, and securely wedged.

Cracking mortar is caused by it being too strong, drying too quick, and being too thin.

Thanks, I used a tub of Cementone general pupose mortar, doubt if that is too strong. I don't think the lead is properly angled into the joint. So it's either a roofer to redo the whole lot as I don't fancy doing that myself or just leave it and repoint again when bits fall out.

Or (complete bodge this) go over the pointing with something like Dow 791 Weatherproofing sealent in light grey using masking tape to get a good finish. This stuff smooths out very well, I read that leadmate is too sticky to smooth out nicely.

Bob
 
Has anyone got any images of leadmate that shows a nice crisp, straight and even joint rather than a wavy up and down in and out series of blobs?
Has anyone got any images of folk looking up at distant lead flashings and commenting how they should have used mortar instead of wavy leadmate.

Mine is always finished perfectly, by the way. I only apply the leadmate (on stepped flashings) to the lead then use mortar for the remainder of the rake-out.

Leadmate is much more temperature tolerant too.
 
Has anyone got any images of folk looking up at distant lead flashings and commenting how they should have used mortar instead of wavy leadmate
This is uncanny. Only last week I was out with my young apprentice on a survey, and whilst he was quick to notice the complete absence of a roof, my more experienced eye pointed out the poor application of leadmate.

foto_no_exif (3).jpg
 
I used mortar on mine, thought I’d do it on the hottest day of last year just to make it easier. A little bit has cracked, so leadmate should sort it, then the mortar and wavy lead mate combo should look great.
I didn’t go for lead mate originally as I’m tight.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top