Hi,
I am going to get a gas safe engineer to disconnect and cap a pipe that runs to an unused gas fire. Pipe will be disconnected next to the meter.
Should the engineer give me any specific paperwork when it is complete?
Any thoughts would be much appreciated.
I am going to get a gas safe engineer to disconnect and cap a pipe that runs to an unused gas fire. Pipe will be disconnected next to the meter.
Should the engineer give me any specific paperwork when it is complete?
Any thoughts would be much appreciated.