What am I supposed to do with the cavities left by removing the walls? They are currently 225mm below dpc.

There is a void underneath the tiles where the screed bridges the gap of 50mm. This is where doors between rooms were

Thanks
 

Attachments

  • 15634393232939134376460327282085.jpg
    15634393232939134376460327282085.jpg
    434.1 KB · Views: 141
  • 15634394502563962042572862290953.jpg
    15634394502563962042572862290953.jpg
    307.3 KB · Views: 146
Sponsored Links
Dpm and concrete. I used blackjack dpm and concrete on some shallower ones recently
 
Thought that might be the simplest option @23vc. Seems a bit pointless trying to squeeze any insulation down there (both slabs have wet UFH). Just make sure continuous DPM!
 
Sponsored Links
So I did this job and now have a similar problem with the new bifolds... The existing slab is 150mm short of the track (course of bricks plus 50mm cavity). The existing dpm won't reach the outer leaf though. I've fitted cavity closers vertically but the floor needs to support tiles.


Should I remove the top course of bricks and extend dpm up to bifolds? I assume I would turn it up at the sides and back and fill with 1:5 mix again.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top