Dear All,
We got PP to build a single story side extension. This lies on our land, and lengthens and existing side extension that is our wall (not party). The next doors land starts immediately after this wall. Basically
Our land|Wall on our land| Neighbours land
Now the neighbours house is about 1.2 meters away, two story 1969 build.
He wants to engage a party wall surveyor in case we cause his house to collapse. Now the length of our wall that will run parallel to his house is 2m. His eaves end wall (9m long) is only 2m parallel to this part where foundations will go. Houses are staggered.
I think it might be a section 6 of the PWA, but not sure if we need one or not, foundation deeper than his?
What’s the best way to go about this? Many thanks
We got PP to build a single story side extension. This lies on our land, and lengthens and existing side extension that is our wall (not party). The next doors land starts immediately after this wall. Basically
Our land|Wall on our land| Neighbours land
Now the neighbours house is about 1.2 meters away, two story 1969 build.
He wants to engage a party wall surveyor in case we cause his house to collapse. Now the length of our wall that will run parallel to his house is 2m. His eaves end wall (9m long) is only 2m parallel to this part where foundations will go. Houses are staggered.
I think it might be a section 6 of the PWA, but not sure if we need one or not, foundation deeper than his?
What’s the best way to go about this? Many thanks