Lead soaker at bottom of dry valley.

Joined
22 Nov 2009
Messages
2,944
Reaction score
758
Location
Oldham
Country
United Kingdom
I think I probably need one here, the valley is possibly a tiny bit too low to run into the guttering.
IMG_20210404_110633200.jpg


I have some 450mm lead so I'd rather fit one now.

How do I do it? Do I just trim the valley back to the front of the fascia then cut the lead with that "V" shape ensuring there's enough overhang to fit into the gutter, and how far back up the valley should the lead go?

Thanks.
 
Sponsored Links
Take the last cutting of grp Valley out and replace with 450mm lead, run it over the fascia and into gutter, check out the top of the fascia to suit if required, turn the lead up at the sides and shape the bottom of lead going into gutter.
Don't put any tile batten in st the bottom. (y)
 
Sponsored Links
It's on, no battens! I'll turn up the sides a bit more, seems to sit ok over the fascia and ready to trim and dress into the gutter when I fit it.

IMG_20210404_135944899.jpg
 
Put the lead over the tray.
That's exactly what I was thinking.

I'd also elongate the valley so that it terminates just behind the fascia. This is so that the water benefits from the shaped valley for as long as possible until it finds the gutter. Otherwise that lead soaker will need some shape to it to prevent sideways movement of water. It's rare but not unheard of, especially if there is leaf litter build up at the bottom of the valley.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top