I asked this before but have had a lot on my mind and let it slip but now have to finish this. So dropped a new 3&e to light switch and I am lowering the ceiling and the attic above is floored so no access, what do you recommend to fix these joints , the cable on the right is the 3&e to the switch I was going to fit a 4way jb but want to do it right as far as I can ?
Thanks
Thanks