Hi all,
just wondering what the correct method of dealing with the below water pipe in my footings. Should I shutter it off either side and lintel over? Just worried there isn’t enough to bridge over to on the other side. Or should I dig more out?
It’s only for bricking up a front up and over door for a garage conversion so won’t have much weight but need it to be right for building control inspection.
Thanks in advance
just wondering what the correct method of dealing with the below water pipe in my footings. Should I shutter it off either side and lintel over? Just worried there isn’t enough to bridge over to on the other side. Or should I dig more out?
It’s only for bricking up a front up and over door for a garage conversion so won’t have much weight but need it to be right for building control inspection.
Thanks in advance