Buy some more joint filler
I always run in the direction of the light source. So from pic 2, left to right parallel with the mustard wall if I was doing that room.
18 years ago? I think you'll be OK :-)
I'd be more concerned that they're not level. They're up and down more than I'd accept as either the fitter or customer
Power off and connect the yellow from original photo to the yellow going to the fan. What does that do?
You said the yellow cable wasn't in the switch.
The yellow going to the fan needs to be removed from where it is and connected to a permanent supply
From that pic it looks like they've connected to switched live only
A timer model needs a permanent live feed. From that pic it looks like they have connected the timer to the switched live. What is at the switch?...
Yes there is, they're called tilers
A pic would help
They look OK where they are
I'd keep them at floor level and then bring up.
If you know where sink unit is going bring them to there and leave at low level until unit is dry fitted.
If you can access them later then bring into room and cap off or fit an iso. Then do 2md fix when you know where they are gonna be needed, when...
I didn't say it was
Adding new circuits is a no no. Existing circuit is fine. In your own home though, who would know?
Yes perfectly acceptable for you to do, power off first
The bath should have been cut into the wall to remove that gap and then the bath tiled down on to to create a good seal
Just go with your trailer in case.
Separate names with a comma.