Sorting that doesn’t sound as if it would be rocket science to sort out though, I guess I need to convince the Building inspector.
Just been told by the guy who did the calculations I can pass through raft with out a problem.
That’s right.
No access to the rear of the property other than a mini digger 1 ton
Being built on made up ground and didn’t want to go down 7ft for strip
That’s what I thought in my mind but need to confirm before I start attempting the alternative of cutting into the existing floor
That’s the plan but from the gulley to existing sewerage I need to access the other side of the building
Hello all, I need to route a 100mm waste pipe from one side of a new extension which will be build on a raft foundation which will have re-bar...