Search results

  1. K

    install new cu

    yes why?
  2. K

    install new cu

    good night bas :wink:
  3. K

    install new cu

    i was just asking has anyone else had the same isue i never asked anyone to do a calculation for me, did i :roll: im not arguing with you as i dont no you. other lads on here gave me a simple answer, and you just want to start arguing all the time. so please if i ask advice on here...
  4. K

    install new cu

    still not got a women in your life yet bas :lol:
  5. K

    install new cu

    no just had a quick look but will tomorow, just thought i would c if you guys have had the same proplems?
  6. K

    install new cu

    hi all got a job installing a dual rcd cu at a bungalow, had a quick look in the loft ect all circuits entering the loft with a 2.5 ringmain well in the insulation all cable are under at least 300mm of insulation what would you do regarding the mcb size.s ect? example the 2.5 ring
  7. K

    Boiler mains electical connection

    he might be an electrician and a plumder but not be part p
  8. K

    Boiler mains electical connection

    a switch fuse spur would be better but if the plumber is not part p then he has no choice but to put on a plug :D
  9. K

    ping pong ball?????

    Were is the sump, and is it easy?
  10. K

    ping pong ball?????

    Have a problem with my beko 7kg aaa class 26rpm a thermostat has gone wich im going 2 replace But water has been coming out of the powder tray and a ping pong ball on the floor undet the wasing machine were dose it go?
  11. K

    niceic essesment

    thanks for the good advice guys, the nic guy had a look at my first job asked me some questions, and show him some testing, then the second job we were only there 15 mins, altogether the assesment lasted about two hours (max)
  12. K

    niceic essesment

    thanks for the replys guys, to be honest im going to get christmas out the way, then have a think about it,
  13. K

    niceic essesment

    all passed :D
  14. K

    niceic essesment

    its not untill the 8th november :lol:
  15. K

    kitchen downlighter

    not really, all i do is pull the fitting down a little and use my fingers to ease the springs from firing out
  16. K

    niceic essesment

    thanks for that martin, but it wont let me send u a message?
  17. K

    niceic essesment

    hi all ive got my niceic domestic installer essesment coming up, im going to start up on my own, instead of working for someone else, anyway on the leaflet i got off the nic with my essesment date it says they will want evidence that i have a written health and safety policy statement...
  18. K

    codes

    martinxxxx. yes thats what im thinking.
  19. K

    codes

    sorry for not replying back quicker bas, i just thought because u could touch the connection and the connection blocks were quite worn it would need improvemet what do you think?
  20. K

    codes

    im doing a periodic on a commercial workshop and in the workshop they have recessed fluorescent modular fittings with the covers missing they are out of reach but you can see the cables going into the connection block what code would be required for this? im thinking a code 2 but im not...
Back
Top