Search results

  1. R

    Do I need to pull the floor up?

    Thanks b-a. It's a one-bed flat so the stairs are surplus to requirements but if the principle you outline applies, ie bond at the start of every pipe run and also bond at the end then if I ensure the kitchen sink and bathroom basin are hot & cold bonded then I should be ok, no? (The...
  2. R

    Do I need to pull the floor up?

    I have recently put a new bathroom in (DIY) and during the course of the work I contrived to drill through the copper cold water pipe. After cutting out the offending piece I put in a plastic Speedfit straight connector. However, I neglected to reinstate the earth link when I put the plastic...
Back
Top