Have a 450mm plastic inspection chamber to install - does this need to sit on pea gravel, as per plastic pipes or should it be bedded onto concrete?
Also, what is the exact spec for bedding/back filling plastic underground drainage pipes in a trench - 100mm pea gravel bed, infill either side...