Sorry, this is a nested question..
Old suspended 1960s floor comprises:
3" void, 3" timber heights (sat on engineering bricks, levelled with cement), floorboards.
Joist spacing sees 440mm approx inbetween joists. Joists are 2.5" wide.
Goals:
- insulate between timbers
- UFH: install over tray...
Removing the non-supporting wall (red lines) which meets front, single-brick, tile-clad wall, between the 2 front windows..
SE initially agrees removal of wall up to front wall.. Then, in report, requires a 50cm stub to remain..
..after querying this, he suggests a windpost design might...
Rented house, ~1967 built. Gas CH. Foam cavity insulation ~1980s.
I had flat roof extension (35 years old) leak repaired - Ivy removed, facia and new gutter fitted, with flashing to close gap between facia and ajoining corrugated garage roof. Leak fixed.
Now to the internal damp problem...
The history is that a brickie lived here years ago and some things he did were not ideal, but now we want to alter several openings.
This is a 1950s 3 bed semi, 50mm cavity brick walls, 330mm thickness of external walls + cavity + plaster.
1. We might want to replace a pair of concrete...