Search results

  1. S

    Diversity and Maximum Demand

    Plugwash: The three phase is left over from when the property was a working farm. At some point in the past the cottages have been wired through one of the phases. The route taken is a good 100m and it has been done in 4mm single core cables - thats the bit I mean by inadequate supply. We are...
  2. S

    Diversity and Maximum Demand

    I'm having two new supplies installed into two adjoining small cottages (currently they are fed, inadequately off a three phase supply). Scottish Hydro are installing two single phase supplies with a maximum capacity of 100 amps each property. Heating will be electric using a "Total Heat...
Back
Top