Search results

  1. C

    Levelling and prepping suspended timber subfloor

    Getting ready to tile ensuite shower room floor and looking for a bit of direction on the subfloor prep. The finish will be porcelain wood plank effect tiles (about 4sqm total) with under tile loose wire electric heating. Room is first floor with 7" joists mostly 18" centres and original...
  2. C

    Moving rad valve across joist for new towel rad

    Swapping existing radiator for traditional type towel radiator and as pipe centres are closer on new rad and I want to keep it central under the window I need to move supply for one valve the other side of a joist below. Looking at the joist in question there is suitably sized hole already...
  3. C

    Fused Spur for Shower Pump

    I would like to fit a shower pump at the base of the Hot Water Cylinder to feed one shower. The closest supply would be a double socket on the second floor but to spur from this socket through the safe zones of the walls and floor below and then to the FCU for the pump would mean a spur length...
  4. C

    Best practice for fitting aquapanel for new shower

    Hi what is the best practice with new shower enclosure: Bed tray, tilebacker down onto tray,seal gap then tile down to tray and seal gap again. Or, Fit tilebacker, butt tray up to tilebacker board, seal then tile down to tray and seal between tile and tray? Just wondering as I know...
Back
Top