Replacing barge boards.
Original wet verge, tiles overhang some 75mm+ from front of board
Cement onto asbestos for wet verge
As the tile overhang is too much for dry verge,if i cut tiles back
verge will sit on the lower part of tile profile, just worried about water ingress.
What is the correct...