Search results

  1. A

    Long kitchen hob extractor run

    The layout of our kitchen refurbishment is leaving me with a headache as to how to run the extractor form the hod over the hob. Option 1: ~8m long with 5 beds of 90 degrees. That avoids joists that run the "wrong" way and allows it to be hidden in the kitchen ceiling before dropping down at the...
  2. A

    Replacing bathroom ceiling (partially)

    I am replacing the bathroom in out 1959 era house. its on the first floor under a unconverted loft. Used to be a separate toilet and bathroom, the cinderblock and timber wall has been removed, leaving a interesting state of ceiling as shown in the attached image. The hallway to toiled ceiling...
  3. A

    5m Kitchen sink/diswasher waste pipe - vent issue

    As part of planning for moving the kitchen in our new home there is going to be a requirement for a waste pipe from the kitchen sink and dishwasher to go further than the limit in the Part H of building regs without a vent (3 or 4m for 40 or 50mm pipe). Excuse the sketch. Top section is the...
  4. A

    CI Soil Stack replacement - Where best to stop

    I have been lurking on these forums for a bit since purchasing our first property and have not needed to ask a question yet - seams most have already been asked however I now have a new question! Start point is I am about to replace the existing CI soil waste pipe outside with a uPVC waste...
Back
Top