The layout of our mains water pipework was recently changed, to move the stopcock on the incoming supply to a downstairs cupboard.
This joins a 22mm pipe that feeds upstairs cold water, and to the boiler on an unvented system. There is a tee off this 22mm pipe into a 15mm pipe which feeds the...