Search results

  1. N

    Wet UFH recommendations

    Hi, I am planning to install a wet system in the next week or 2, prior to screed arrival for my new kitchen floor. Having done quite a bit of googling, I can't seem to find many impartial places of advice as to what's a half decent and not too pricey ufh system for approx 28m2 in a single...
  2. N

    110mm to sink waste

    Hi all, I'm about to lay the 110mm soil pipe needed to route my kitchen sink, washing machine etc. to the main drain, before pouring the slab for the base of my new floor. I was planning on having bends vertically up through the slab in order to connect to 40mm waste pipe etc. Would welcome...
  3. N

    Temporary pier for RSJs - padstones required?

    Hi all, I am building a side-return extension on my victorian terrace, removing 2 internal walls and 1 external wall. My plan is to remove the internal walls first, leaving small portions of the wall in place as temporary piers (the parts which join the external wall which will be removed when...
  4. N

    Pouring slabs at different times - connect with rebar/helibar?

    Hi, First time post - go easy on me. I'm building a side-return extension on my victorian terrace which also requires the removal of two internal walls which divide the kitchen into 3 rooms. To keep the house functional and to save money, my plan is to work my way back from the end of the...
Back
Top