Hi,
A survey has found a rubble-filled stone wall in our terrace needs strapping to the side walls and floor of the structure. The detail the engineer has recommended involves cutting out a big chunk of the inner leaf, drilling and gluing standard ties into the outer leaf, casting a 300mm cube...