Hi thanks for that. Sadly the existing clay 90 bend was entombed in concrete the whole way round as well as the pipe at least 1m back towards the drain, meaning it was not possible with the access i had (!) to be able to reveal enough clay pipe minus concrete casing to add a join to for option...