    Ive got some walls to take down that have sockets in them and the Electrician isnt due for a few weeks. So i'd like to check that the way I intend to move them is safe until everything is replaced with new cables,
    So is this ok? -
    Turn off the circuit at the consumer unit, check the sockets off
    Take the sockets out the wall
    reconnect the wires in a junction box, under the floorboards
    And for something thats not a ring circuit like the cooker cable do you just put that in a junction box also and leave off at the consumer unit?
    Cheers
     
  2. Sponsored Links
  3. fluorescence

    fluorescence

    Joined:
    15 Jun 2018
    Messages:
    190
    Thanks Received:
    24
    Country:
    United Kingdom
    Have patience & leave well alone
     
    • Thanks Thanks x 1
  4. JohnW2

    JohnW2

    Joined:
    28 Jan 2011
    Messages:
    48,608
    Thanks Received:
    3,189
    Location:
    Buckinghamshire
    Country:
    United Kingdom
    Is it quite as simple as just 'patience'?

    I took it to mean that the OP wanted to remove some walls (and presumably do other building work) before the electrician comes to do the re-wiring ("until everything is replaced with new cables"). He could, of course, get the electrician to come on a second, earlier, occasion to do something temporary with the existing installation, but I suspect the OP is hoping to avoid the need for (cost of) that.

    Kind Regards, John
     
  5. TimboTwo

    TimboTwo

    Joined:
    30 Jan 2021
    Messages:
    156
    Thanks Received:
    28
    Country:
    United Kingdom
    Most people just bash the walls down and to hell with the electrics.
    Kudos to the OP for wanting to do it properly.
     
    • Like Like x 4
    • Thanks Thanks x 1
  6. CBW

    CBW

    Joined:
    26 Sep 2019
    Messages:
    8,960
    Thanks Received:
    2,390
    Location:
    North
    Country:
    United Kingdom
    What method will you be using to check sockets are off? You need to be confident that the circuit you’re working on is dead.
     
    • Thanks Thanks x 1
    • Like Like x 1
  7. JohnW2

    JohnW2

    Joined:
    28 Jan 2011
    Messages:
    48,608
    Thanks Received:
    3,189
    Location:
    Buckinghamshire
    Country:
    United Kingdom
    I would think that in a situation like the OP describes, 'switching everything off' (with a 'Main Switch') would be the most sensible course (assuming one is confident that there is only one CU/Fusebox/whatever!) - but, even then, a proper confirmation of 'dead' would, as you suggest, would be desirable.

    Kind Regards, John
     
    • Thanks Thanks x 1
    • Like Like x 1
  8. Sponsored Links
  9. SUNRAY

    SUNRAY

    Joined:
    28 Jul 2009
    Messages:
    5,542
    Thanks Received:
    423
    Location:
    Kent
    Country:
    United Kingdom
    Indeed well done for asking first. It makes a refreshing change.

    It sounds to me like OP is trying to make things safe during building works and knowing how difficult it can be to get trades in for a very short visit for such an operation I empathise with the question.

    If you are comfortable working with the cables yes a temporary job can be done with junction boxes as long as they can be safely protected against damage during the building work, such as under the floor.

    PM sent.
     
    • Thanks Thanks x 1
    • Like Like x 1
  10. sparkwright

    sparkwright

    Joined:
    20 Aug 2009
    Messages:
    8,772
    Thanks Received:
    1,101
    Location:
    Dorset
    Country:
    United Kingdom
    It's more likely that when the electrician turns up, he will want to leave the electrics as they are, and for you to knock the walls down leaving the electrics in situ first.

    You see, if he turns up now, what can he do?

    He can only take the faceplates off and put in connectors - waste of time.

    If you start taking things off and joining things, he can't be sure of how it was originally - so waste of time.

    Chances are, with the walls removed, the electrician has a better chance of carrying out the necessary work because he will then have access to work as their will be holes in the ceiling.

    Whatever you decide, isolate the electricity fully before starting any work.
     
    Last edited: 6 May 2021
    • Thanks Thanks x 1
  11. itsnotplumb

    itsnotplumb

    Joined:
    5 Feb 2012
    Messages:
    81
    Thanks Received:
    0
    Location:
    kent
    Country:
    United Kingdom
    Thanks for replies. It was the electrician that told me what to do. But he talks fast so I thought I'd double check on here.
    I've got one of those pen shaped testers and the plug thing that tells you if a sockets wired up properly, made by GAP. I figured I'd make the circuit short as possible and leave it under the floor close to the unit. And assumed if in doubt to use a heavy duty fuse box. Wouldn't mind a pro doing it but all trades are hard to get hold of in this area.
     
  12. CBW

    CBW

    Joined:
    26 Sep 2019
    Messages:
    8,960
    Thanks Received:
    2,390
    Location:
    North
    Country:
    United Kingdom
    The trouble is John, OP didn’t state switching everything off, leading me to suggest checking dead
     
  13. JohnW2

    JohnW2

    Joined:
    28 Jan 2011
    Messages:
    48,608
    Thanks Received:
    3,189
    Location:
    Buckinghamshire
    Country:
    United Kingdom
    Indeed he didn't (he said just "turn off the circuit at CU"), which is why I suggested it to him.
    Again, indeed - and I agreed with you in the rest of my sentence (which you omitted from your quote of what I had written to you) ...
    Kind Regards, John
     
    • Thanks Thanks x 1
  14. DIYnot Local

    DIYnot Local

    Joined:
    3 Sep 2019
    Country:
    United Kingdom

    If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

    Select the supplier or trade you require, enter your location to begin your search.


    Are you a trade or supplier? You can create your listing free at DIYnot Local

     
Loading...

Share This Page